科技报告详细信息
Linac Coherent Light Source II (LCLS-II) Conceptual Design Report
Stohr, J
关键词: ASIA;    BEAM DUMPS;    CAPACITY;    DESIGN;    ELECTRON SOURCES;    EUROPE;    FREE ELECTRON LASERS;    IMPLEMENTATION;    LIGHT SOURCES;    LINEAR ACCELERATORS;    MODIFICATIONS;    PHOTONS;    PLANNING;    POLARIZATION;    PROBES;    SAFETY REPORTS;    STANFORD LINEAR ACCELERATOR CENTER;    TIME DELAY;    WIGGLER MAGNETS ACCPHY;    ACCSYS;    XFEL;   
DOI  :  10.2172/1029479
RP-ID  :  SLAC-R-978
PID  :  OSTI ID: 1029479
Others  :  TRN: US1200028
学科分类:核物理和高能物理
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】
The LCLS-II Project is designed to support the DOE Office of Science mission, as described in the 22 April 2010 Mission Need Statement. The scope of the Project was chosen to provide an increase in capabilities and capacity for the facility both at project completion in 2017 and in the subsequent decade. The Project is designed to address all points of the Mission Need Statement (MNS): (1) Expanded spectral reach; (2) Capability to provide x-ray beams with controllable polarization; (3) Capability to provide 'pump' pulses over a vastly extended range of photon energies to a sample, synchronized to LCLS-II x-ray probe pulses with controllable inter-pulse time delay; and (4) Increase of user access through parallel rather than serial x-ray beam use within the constraint of a $300M-$400M Total Project Cost (TPC) range. The LCLS-II Project will construct: (1) A hard x-ray undulator source (2-13 keV); (2) A soft x-ray undulator source (250-2,000 eV); (3) A dedicated, independent electron source for these new undulators, using sectors 10-20 of the SLAC linac; (4) Modifications to existing SLAC facilities for the injector and new shielded enclosures for the undulator sources, beam dumps and x-ray front ends; (5) A new experiment hall capable of accommodating four experiment stations; and (6) Relocation of the two soft x-ray instruments in the existing Near Experiment Hall (NEH) to the new experiment hall (Experiment Hall-II). A key objective of LCLS-II is to maintain near-term international leadership in the study of matter on the fundamental atomic length scale and the associated ultrafast time scales of atomic motion and electronic transformation. Clearly, such studies promise scientific breakthroughs in key areas of societal needs like energy, environment, health and technology, and they are uniquely enabled by forefront X-ray Free Electron Laser (X-FEL) facilities. While the implementation of LCLS-II extends to about 2017, it is important to realize that LCLS-II only constitutes a stepping stone to what we believe is needed over a longer time scale. At present, a practical time horizon for planning is about 15 years into the future, matching that of worldwide planning activities for competitive X-FEL facilities in Europe and Asia. We therefore envision LCLS-II as an important stage in development to what is required by about 2025, tentatively called LCLS-2025, for continued US leadership even as new facilities around the world are being completed. We envision LCLS primarily as a hard x-ray FEL facility with some soft x-ray capabilities. A survey of planned X-FEL facilities around the world suggests that US planning to 2025 needs to include an internationally competitive soft x-ray FEL facility which complements the LCLS plans outlined in this document.
【 预 览 】
附件列表
Files Size Format View
RO201704210000373LZ 24524KB PDF download
  文献评价指标  
  下载次数:81次 浏览次数:47次