| Electron Bypass Line (EBL) Design: Electrons to A-line bypassing LCLS | |
| Fieguth, T.a Arnold, R. ; /SLAC | |
| 关键词: BEAM DUMPS; COMMISSIONING; DESIGN; ELECTRONS; MODIFICATIONS; PHYSICS; STANFORD LINEAR ACCELERATOR CENTER Accelerators; ACCSYS; | |
| DOI : 10.2172/922589 RP-ID : SLAC-TN-08-001 PID : OSTI ID: 922589 Others : TRN: US0802178 |
|
| 学科分类:核物理和高能物理 | |
| 美国|英语 | |
| 来源: SciTech Connect | |
PDF
|
|
【 摘 要 】
Forty one years ago, September 20, 1966, the first beam entered End Station A, passed on through, and was terminated in Beam Dump East. This beam had an energy of 18.4 GeV, a record for the time. Since then, the SLAC ESA has been a mainstay facility for many high-energy physics and test beam experiments involving countless hours of data taking. Heretofore, it was assumed that with the completion and commissioning of the LCLS facility, beams from the main injector would no longer be available to this well equipped experimental facility. Fortunately, it has become clear that a bypass beamline design calling for modest modifications and using existing, soon to be surplus, components will enable continued utilization of this important facility.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| RO201705180002827LZ | 373KB |
PDF