科技报告详细信息
Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada for Fiscal Year 2011 (October 2010-September 2011)
NSTec Environmental Restoration
关键词: AR FACILITIES;    CONTAINMENT;    EVALUATION;    INJECTION WELLS;    MAINTENANCE;    MOISTURE;    MONITORING;    PLANTS;    PONDS;    PRECIPITATION;    REMEDIAL ACTION;    RESOURCE CONSERVATION;    SOILS;    WASTES post-closure;    RCRA;    Resource Conservation and Recovery Act;    Corrective Action Unit;    Nevada;   
DOI  :  10.2172/1033256
RP-ID  :  DOE/NV--1470
PID  :  OSTI ID: 1033256
Others  :  TRN: US1200642
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】
This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): (1) CAU 90, Area 2 Bitcutter Containment; (2) CAU 91, Area 3 U-3fi Injection Well; (3) CAU 92, Area 6 Decon Pond Facility; (4) CAU 110, Area 3 WMD U-3ax/bl Crater; and (5) CAU 112, Area 23 Hazardous Waste Trenches. This report covers fiscal year 2011 (October 2010-September 2011). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches in a 24-hour period. Inspections include an evaluation of the condition of the units and identification of any deficiencies that may compromise the integrity of the units. The condition of covers, fencing, signs, gates, and locks is documented. In addition, soil moisture monitoring and subsidence surveys are conducted at CAU 110. The results of the inspections, summary of maintenance activities, results of vegetations surveys, and analysis of monitoring data are presented in this report. Copies of the inspection checklists are included as Appendix A. Field notes completed during each inspection are included in Appendix B. Photographs taken during the inspections are included in Appendix C. It is recommended to continue semiannual inspections at CAUs 90 and 91; quarterly inspections at CAUs 92, 110, and 112; and additional inspections at CAU 92 if precipitation occurs in excess of 0.50 inches in a 24-hour period. At CAU 92, it is recommended to remove the wave barriers, as they have not proven to be necessary to protect the cover. At CAU 110, it is recommended to continue annual vegetation monitoring and soil moisture monitoring, and to reduce the frequency of subsidence surveys from twice per year to once every other year (biennially).
【 预 览 】
附件列表
Files Size Format View
RO201704190004376LZ 27382KB PDF download
  文献评价指标  
  下载次数:18次 浏览次数:40次