科技报告详细信息
Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada Test Site, Nevada, For Fiscal Year 2008 (October 2007-September 2008)
NSTec Environmental Restoration
关键词: CONTAINMENT;    EVALUATION;    IMAGES;    INJECTION WELLS;    MAINTENANCE;    MOISTURE;    MONITORING;    NEVADA TEST SITE;    PONDS;    PRECIPITATION;    RESOURCE CONSERVATION;    SOILS;    WASTES Resource Conversation and Recovery Act;    RCRA;    Corrective Action Units;    CAU;    Nevada Test Site;   
DOI  :  10.2172/979391
RP-ID  :  DOE/NV--1305
PID  :  OSTI ID: 979391
Others  :  TRN: US1007624
学科分类:核能源与工程
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

This report is the first combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): • CAU 90, Area 2 Bitcutter Containment • CAU 91, Area 3 U-3fi Injection Well • CAU 92, Area 6 Decon Pond Facility • CAU 110, Area 3 WMD U-3ax/bl Crater • CAU 112, Area 23 Hazardous Waste Trenches The locations of the sites are shown in Figure 1. This report covers fiscal year (FY) 2008 (October 2007–September 2008). Because this is the first combined annual report for these CAUs, this report only covers the period not covered in the previous annual report for each CAU. For example, the last report submitted for CAU 91 covered the period January 2007–December 2007; therefore, this report only covers the remainder of FY2008 (January 2008–September 2008) for CAU 91. The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0021 and summarized in each CAU-specific section in Section 1.0 of this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches in a 24-hour period. Inspections include an evaluation of the condition of the units and identification of any deficiencies that may compromise the integrity of the units. The condition of covers, fencing, signs, gates, and locks is documented. In addition, soil moisture monitoring and subsidence surveys are conducted at CAU 110. The results of the inspections, summary of maintenance activities, results of vegetations surveys, and analysis of monitoring data are presented in this report. Copies of the inspection checklists are included as Appendix A. Field notes completed during each inspection are included in Appendix B. Photographs taken during the site inspections are included in Appendix C.

【 预 览 】
附件列表
Files Size Format View
RO201705180000117LZ 14448KB PDF download
  文献评价指标  
  下载次数:25次 浏览次数:54次