科技报告详细信息
Feasibility Study of Economics and Performance of a Hydroelectric Installation at the Jeddo Mine Drainage Tunnel. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Ener
Roberts, J. O. ; Mosey, G.
关键词: EPA;    FEASIBILITY STUDY;    JEDDO;    HYDROELECTRIC;    GEOTHERMAL;    ECONOMICS;    PENNSYLVANIA;    HEAT PUMP;    Hydropower;    Energy Analysis;   
DOI  :  10.2172/1068622
RP-ID  :  NREL/TP-6A20-51321
PID  :  OSTI ID: 1068622
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Jeddo Tunnel discharge site for a feasibility study of renewable energy potential. The purpose of this report is to assess technical and economic viability of the site for hydroelectric and geothermal energy production. In addition, the report outlines financing options that could assist in the implementation of a system.

【 预 览 】
附件列表
Files Size Format View
RO201704180004272LZ 6218KB PDF download
  文献评价指标  
  下载次数:13次 浏览次数:19次