科技报告详细信息
| Feasibility Study of Economics and Performance of a Hydroelectric Installation at the Jeddo Mine Drainage Tunnel. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Ener | |
| Roberts, J. O. ; Mosey, G. | |
| 关键词: EPA; FEASIBILITY STUDY; JEDDO; HYDROELECTRIC; GEOTHERMAL; ECONOMICS; PENNSYLVANIA; HEAT PUMP; Hydropower; Energy Analysis; | |
| DOI : 10.2172/1068622 RP-ID : NREL/TP-6A20-51321 PID : OSTI ID: 1068622 |
|
| 美国|英语 | |
| 来源: SciTech Connect | |
PDF
|
|
【 摘 要 】
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Jeddo Tunnel discharge site for a feasibility study of renewable energy potential. The purpose of this report is to assess technical and economic viability of the site for hydroelectric and geothermal energy production. In addition, the report outlines financing options that could assist in the implementation of a system.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| RO201704180004272LZ | 6218KB |
PDF