科技报告详细信息
Feasibility Study of Biopower in East Helena, Montana. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites
Moriarty, K.
关键词: EPA;    FEASIBILITY STUDY;    AMERICAN SMELTING AND REFINING COMPANY;    ASARCO;    HELENA;    MONTANA;    BIOMASS;    BIOPOWER;    RENEWABLE PORTFOLIO STANDARD;    RPS;    SUPERFUND;    BIOENERGY;    COMBINED HEAT AND POWER;    CHP;    FEEDSTOCK;    INCENTIVES;    Market Transformation;    Bioenergy;   
DOI  :  10.2172/1064534
RP-ID  :  NREL/TP-7A30-57610
PID  :  OSTI ID: 1064534
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】
The U.S. Environmental Protection Agency (EPA) developed the RE-Powering America's Land initiative to reuse contaminated sites for renewable energy generation when aligned with the community's vision for the site. The former American Smelting and Refining Company (Asarco) smelter in East Helena, Montana, was selected for a feasibility study under the initiative. Biomass was chosen as the renewable energy resource based on the wood products industry in the area. Biopower was selected as the technology based on Montana's renewable portfolio standard (RPS) requiring utilities to purchase renewable power.
【 预 览 】
附件列表
Files Size Format View
RO201704180004237LZ 3007KB PDF download
  文献评价指标  
  下载次数:9次 浏览次数:31次