科技报告详细信息
Feasibility Study of Biopower in East Helena, Montana. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites | |
Moriarty, K. | |
关键词: EPA; FEASIBILITY STUDY; AMERICAN SMELTING AND REFINING COMPANY; ASARCO; HELENA; MONTANA; BIOMASS; BIOPOWER; RENEWABLE PORTFOLIO STANDARD; RPS; SUPERFUND; BIOENERGY; COMBINED HEAT AND POWER; CHP; FEEDSTOCK; INCENTIVES; Market Transformation; Bioenergy; | |
DOI : 10.2172/1064534 RP-ID : NREL/TP-7A30-57610 PID : OSTI ID: 1064534 |
|
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
The U.S. Environmental Protection Agency (EPA) developed the RE-Powering America's Land initiative to reuse contaminated sites for renewable energy generation when aligned with the community's vision for the site. The former American Smelting and Refining Company (Asarco) smelter in East Helena, Montana, was selected for a feasibility study under the initiative. Biomass was chosen as the renewable energy resource based on the wood products industry in the area. Biopower was selected as the technology based on Montana's renewable portfolio standard (RPS) requiring utilities to purchase renewable power.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RO201704180004237LZ | 3007KB | download |