科技报告详细信息
Hiilangaay Hydroelectric Project ??? Final Report
Twitchell, Sara1  Stimac, Michael1  Lang, Lisa2  Witwer, Doreen2  Jameson, Vincent2 
[1] HDR, Omaha, NE (United States);Haida Corporation, Hydaburg, AK (United States)
关键词: Tribal Energy;    Hydropower;    Renewable;    Haida Energy;   
DOI  :  10.2172/1255174
RP-ID  :  DOE--0002502
PID  :  OSTI ID: 1255174
Others  :  Other: 5034772347
学科分类:再生能源与代替技术
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

The Hiilangaay Hydroelectric Project (???Hiilangaay??? or the ???Project???) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible to move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy

【 预 览 】
附件列表
Files Size Format View
1000KB PDF download
  文献评价指标  
  下载次数:19次 浏览次数:53次