期刊论文详细信息
JOURNAL OF CLEANER PRODUCTION 卷:22
Industrial water management by multiobjective optimization: from individual to collective solution through eco-industrial parks
Article
Boix, Marianne1  Montastruc, Ludovic1  Pibouleau, Luc1  Azzaro-Pantel, Catherine1  Domenech, Serge1 
[1] Univ Toulouse, INPT, CNRS, LGC, F-31432 Toulouse, France
关键词: Water network;    Multiobjective optimization;    MILP;    Eco-industrial park;   
DOI  :  10.1016/j.jclepro.2011.09.011
来源: Elsevier
PDF
【 摘 要 】

Industrial water networks are designed in the first part by a multiobjective optimization strategy, where fresh water, regenerated water flow rates as well as the number of network connections (integer variables) are minimized. The problem is formulated as a Mixed-Integer Linear Programming problem (MILP) and solved by the e-constraint method. The linearization of the problem is based on the necessary conditions of optimality defined by Savelski and Bagajewicz (2000). The approach is validated on a published example involving only one contaminant. In the second part the MILP strategy is implemented for designing an Eco-Industrial Park (EIP) involving three companies. Three scenarios are considered: EIP without regeneration unit, EIP where each company owns its regeneration unit and EIP where the three companies share regeneration unit(s). Three possible regeneration units can be chosen, and the MILP is solved under two kinds of conditions: limited or unlimited number of connections, same or different gains for each company. All these cases are compared according to the global equivalent cost expressed in fresh water and taking also into account the network complexity through the number of connections. The best EIP solution for the three companies can be determined. (C) 2011 Elsevier Ltd. All rights reserved.

【 授权许可】

Free   

【 预 览 】
附件列表
Files Size Format View
10_1016_j_jclepro_2011_09_011.pdf 872KB PDF download
  文献评价指标  
  下载次数:0次 浏览次数:0次