期刊论文详细信息
Symmetry
Application of Game Theory against Nature in Supporting Bid Pricing in Construction
Piotr Jaśkowski1  Łukasz Rzepecki1 
[1] Faculty of Civil Engineering and Architecture, Lublin University of Technology, 40 Nadbystrzycka St, 20-618 Lublin, Poland;
关键词: bid price predicting;    civil engineering;    construction company marketing;    construction project management;    cost management;    decision-making methods;   
DOI  :  10.3390/sym13010132
来源: DOAJ
【 摘 要 】

The problem of setting prices for construction works is significant for both the investor and contractor companies. The periodically occurring instabilities in the economy require investment process participants to perform detailed market analyses and assessments, as well as to monitor price forecasts in construction. It is only after such an assessment that it is possible within the framework of the initial assumptions for cost calculation to select the basis for setting prices and their levels. The identification and analysis of the risks related to uncontrolled price increases allow contractors to secure their businesses by developing bids that ensure maximum profit. In view of the above, this study proposes an approach based on the use of game theory against nature to identify the optimal variant of a bid estimate. The study considers price forecasts for construction products, which may reduce the negative impact in case the prices increase. The obtained results confirmed the effectiveness of the used decision-making support methods, indicating the optimal strategy to reduce financial losses in times of market instability. The proposed approach also allows for a balance (symmetry) between maximum profit and probability of winning the contract.

【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:0次