A Simulation Model of Construction Projects Executed in Random Conditions with the Overlapping Construction Works
Łukasz Rzepecki1  Sławomir Biruk1 
[1] Faculty of Civil Engineering and Architecture, Lublin University of Technology, 40 Nadbystrzycka St., 20-618 Lublin, Poland;
关键词: civil engineering;    construction project management;    construction scheduling;    random conditions;    simulation method;   
DOI  :  10.3390/su13115795
来源: DOAJ
【 摘 要 】

Reducing the duration of construction works requires additional organizational measures, such as selecting construction methods that assure a shorter realization time, engaging additional resources, working overtime, or allowing construction works to be performed simultaneously in the same working units. The simultaneous work of crews may affect the quality of works and the efficiency of construction processes. This article presents a simulation model aimed at assessing the impact of the overlap period on the extension of the working time of the crews and the reduction of a repetitive project’s duration in random conditions. The purpose of simulation studies is to provide construction managers with guidelines when deciding on the dates of starting the sequential technological process lines realized by specialized working crews, for sustainable scheduling and organization of construction projects.

【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:0次