期刊论文详细信息
IEEE Access
Rough Registration of BIM Element Projection for Construction Progress Tracking
Jingguo Xue1  Xueliang Hou1  Ying Zeng2 
[1] School of Economic and Management, North China Electric Power University, Beijing, China;State Grid Mianyang Power Supply Company, Mianyang, China;
关键词: 3D reconstruction;    building information modeling;    computer vision;    construction component detection;    rough registration;   
DOI  :  10.1109/ACCESS.2022.3144150
来源: DOAJ
【 摘 要 】

Monitoring construction progress is essential for project management. A variety of excellent automatic schedule acquisition methods have been proposed, particularly 3D reconstruction. However, both laser-based and image-based 3D reconstruction methods rely on point clouds which have some inherent defects. In this study, a rough registration method was proposed to obtain construction progress. The method does not generate point clouds during the entire process but determines the actual construction progress by registering the target detection results and the projection of building information model elements. The method was tested at the construction sites of commercial and residential buildings. The experimental results indicated that the registration accuracy reached 95.13%. The average external parameter calibration time and the registration time of each image are 18.57s and 50.59ms, respectively. Compared to similar 3D reconstruction methods, the proposed method is realistic, fast, and simple. This provides a promising method for 3D reconstruction from unordered construction-site images.

【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:4次