The influence of connecting pile cap-column in the mechanisms of break in the two pile caps | |
关键词: blocos sobre duas estacas; concreto armado; fundações; | |
DOI : 10.1590/s1983-41952016000600004 | |
来源: DOAJ |
【 摘 要 】
Abstract The paper analyzes the two pile caps with partially embedded socket and subject a center load. Three models were experimentally tested, varying the type of conformation of the column and walls of the socket, with a smooth, the other rough, and a monolithic two pile cap, used for reference. The roughening of the column-socket interface was examined with the aim of verifying the difference of the distribution of compressive and tensile stresses in the strut an tie model used for design. The experimental test to show that the two pile caps with conformation rough of the column and walls of the socket, support more load in comparison with two pile caps with smooth of the column and walls of the socket. Both however underperformed the monolithic two pile cap, with values of 66% and 36% respectively.
【 授权许可】
Unknown