期刊论文详细信息
Rem: Revista Escola de Minas
Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"
Aleksandar Milutinovic1  Aleksandar Ganic1  Thamer Rayes Diyab1  Rade Tokalic1  Meri Ganic1 
关键词: underground mining;    bauxite mine;    mine surveying;    a priori accuracy assessment;   
DOI  :  10.1590/0370-44672014680100
来源: SciELO
PDF
【 摘 要 】

Mining projects for mineral resource mining contain in certain cases specific technical and technological solutions, these being the result of the mine’s characteristic spatial position and the geometry of the ore deposit, existing mining works, structures, and terrain relief etc. For the purpose of completion of the mining project, it is necessary to carry out a series of mining and surveying tasks during the pre-project and project stage of mining, as well as during the construction of mining facilities and excavation of mineral resources. Specific features of the project concerning excavation of the remaining reserves of bauxite in the deposit of "Podbracan", and in this way the forthcoming mining and surveying works, are displayed by the integration of the underground mining project into the existing mine chambers, infrastructure structures on the terrain surface and into the open pit. Large number of mining and surveying works will follow the completion of this project, but in the meantime, this paper shows the a priory accuracy assessment of the spatial position of the point, it being the exit point to the existing bench of the open pit at the elevation +420m.

【 授权许可】

CC BY   
 All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License

【 预 览 】
附件列表
Files Size Format View
RO202005130133790ZK.pdf 3362KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:5次