期刊论文详细信息
Rem: Revista Escola de Minas
Project optimization
Carla De Carli1  Peroni Rodrigo De Lemos1 
关键词: mine planning;    open pit optimization;    underground mining;    methods transition;    planejamento de mina;    otimização de cava;    lavra subterrânea;    transição de métodos;   
DOI  :  10.1590/0370-44672015680018
来源: SciELO
PDF
【 摘 要 】

A mineral deposit can be exploited by underground methods or by open pit methods, defined according to their characteristics, especially in relation to depth and geometry of the ore body and the economic feasibility of the methods. However, there are cases in which the alternative that represents the best return for the project is the application of combined methods, i.e., the open pit followed by underground mining. In these situations, the major difficulty is the definition of the transition point of methods, seeking to maximize the net present value of the project and the use of mineral resources. The premature suspension of activities in the open pit, as well as advancing beyond the optimum depth, can derail the implementation of the combination of methods, so it is important to analyze the project not only individually but also in an integrated way.

【 授权许可】

CC BY   
 All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License

【 预 览 】
附件列表
Files Size Format View
RO202005130133763ZK.pdf 526KB PDF download
  文献评价指标  
  下载次数:6次 浏览次数:10次