期刊论文详细信息
Energies
Geothermal Potential Evaluation for Northern Chile and Suggestions for New Energy Plans
关键词: renewable energy;    geothermics;    strategic energy planning;    sustainable development;    Chile;   
DOI  :  10.3390/en7085444
来源: mdpi
PDF
【 摘 要 】

Chile is a country rich in natural resources, and it is the world’s largest producer and exporter of copper. Mining is the main industry and is an essential part of the Chilean economy, but the country has limited indigenous fossil fuels—over 90% of the country’s fossil fuels must be imported. The electricity market in Chile comprises two main independent systems: the Northern Interconnected Power Grid (SING) and the Central Interconnected Power Grid (SIC). Currently, the primary Chilean energy source is imported fossil fuels, whereas hydropower represents the main indigenous source. Other renewables such as wind, solar, biomass and geothermics are as yet poorly developed. Specifically, geothermal energy has not been exploited in Chile, but among all renewables it has the greatest potential. The transition from thermal power plants to renewable energy power plants is an important target for the Chilean Government in order to reduce dependence on imported fossil fuels. In this framework, the proposed study presents an evaluation of the geothermal potential for northern Chile in terms of power generation. The El Tatio, Surire, Puchuldiza, Orriputunco-Olca and Apacheta geothermal fields are considered for the analysis. The estimated electrical power is approximately 1300 MWe, and the energy supply is 10,200 GWh/year. This means that more than 30% of the SING energy could be provided from geothermal energy, reducing the dependence on imported fossil fuels, saving 8 Mton/year of CO2 and supplying the mining industry, which is Chile’s primary energy user.

【 授权许可】

CC BY   
© 2014 by the authors; licensee MDPI, Basel, Switzerland.

【 预 览 】
附件列表
Files Size Format View
RO202003190022584ZK.pdf 815KB PDF download
  文献评价指标  
  下载次数:9次 浏览次数:24次