期刊论文详细信息
Proceedings of the International Conference on Coastal Engineering
INITIAL GAP IN BREAKOUT OF HALF-BURIED SUBMARINE PIPE DUE TO WAVE ACTION
Mostafa A. Foda2  Adrian W.K. Law1 
[1] Bechtel Corporation;Hydraulic and Coastal Engineering Division, Department of Civil Engineering, University of California at Berkeley
关键词: submarine pipe;    pipeling;    pipe breakout;   
DOI  :  10.9753/icce.v24.%p
学科分类:建筑学
来源: Coastal Engineering Research Council
PDF
【 摘 要 】

An analytical formulation is presented for the analysis of the breakout of a half-buried submarine pipe due to wave action. The formulation accounts for the contact between the pipe and the soil due to the horizontal hydrodynamic force. An asymmetric gap geometry is described that incorporates a second order expansion in the gap opening due to the pipe rise. Results with this formulation demonstrate the existence of an initial gap of the order 1 mm in the breakout experiments. With this initial gap, the gap flux dominated the influx of water into the gap from the beginning of the breakout process.

【 授权许可】

Unknown   

【 预 览 】
附件列表
Files Size Format View
RO201912020441007ZK.pdf 134KB PDF download
  文献评价指标  
  下载次数:4次 浏览次数:5次