期刊论文详细信息
Mathematical and Computational Applications
A Complex Variable Solution for Lining Stress and Deformation in a Non-Circular Deep Tunnel II Practical Application and Verification
Chen, Shougen1  Li, Yansong2 
[1] Author to whom correspondence should be addressed.;MOE Key Laboratory of Transportation Tunnel Engineering, Southwest Jiaotong University, Chengdu 610031, Sichuan, China
关键词: non-circular deep tunnel;    complex variables;    conformal mapping;    elasticity;    numerical simulation;   
DOI  :  10.3390/mca23030043
学科分类:计算数学
来源: mdpi
PDF
【 摘 要 】

A new complex variable method is presented for stress and displacement problems in a non-circular deep tunnel with certain given boundary conditions at infinity. In order to overcome the complex problems caused by non-circular geometric configurations and the multiply-connected region, a complex variable method and continuity boundary conditions are used to determine stress and displacement within the tunnel lining and within the surrounding rock. The coefficients in the conformal mapping function and stress functions are determined by the optimal design and complex variable method, respectively. The new method is validated by FLAC3D finite difference software through an example. Both the new method and the numerical simulation obtained similar results for the stress concentration and the minimum radial displacement occurred at a similar place in the tunnel. It is demonstrated that the new complex variable method is reliable and reasonable. The new method also provides another way to solve non-circular tunnel excavation problems in a faster and more accurate way.

【 授权许可】

CC BY   

【 预 览 】
附件列表
Files Size Format View
RO201910253700308ZK.pdf 2736KB PDF download
  文献评价指标  
  下载次数:1次 浏览次数:3次