| Archives of civil engineering | |
| Selection of the General Contractor Using the AHP Method | |
| MSc., Eng. P. CiechowiczStudent at Warsaw University of Technology, Faculty of Civil Engineering, Al. Armii Ludowej 16, 00-637 Warsaw,PolandOther articles by this author:De Gruyter OnlineGoogle Scholar1  PhD., Eng. M. Ksi??ekCorresponding authorWarsaw University of Technology, Faculty of Civil Engineering, Al. Armii Ludowej 16, 00-637 Warsaw,PolandEmailOther articles by this author:De Gruyter OnlineGoogle Scholar2  | |
| [1] Student at Warsaw University of Technology, Faculty of Civil Engineering, Al. Armii Ludowej 16, 00-637 Warsaw,Poland;Warsaw University of Technology, Faculty of Civil Engineering, Al. Armii Ludowej 16, 00-637 Warsaw,Poland | |
| 关键词: Keywords: tender; General Contractor; AHP; decision-making; | |
| DOI : 10.1515/ace-2015-0086 | |
| 学科分类:建筑学 | |
| 来源: Polska Akademia Nauk * Instytut Podstawowych Problemow Techniki / Polish Academy of Sciences, Institute of Fundamental Technological Research | |
PDF
|
|
【 摘 要 】
The topic of this paper is the description of the General Contractor Selection procedure using the AHP method. Another aim of this paper - within the scope of decision-making - is the determination of the potential General Contractor’s evaluation criteria and the selection of the best Bidder using the AHP method. We included the description of the conducted tender proceeding for the purpose of the procurement’s subject. As the decision-making options, we adopted four construction companies that submitted their bid. A key element of the studies was the paired comparison of all hierarchical structure elements. We estimated the local weighting coefficients and global priorities of particular decision-making options as well as analysed the vulnerabilities of the obtained results.