会议论文详细信息
6th Annual International Conference on Material Science and Engineering
Stability analysis of synchronous construction of towers and beams of cable-stayed bridge
Yang, Zeying^1 ; Sun, Minghao^1 ; Liu, Yangyudong^1 ; Qu, Yongye^1 ; Zhang, Yalei^1 ; Xie, Xinnan^1
School of Civil Engineering, Shandong University, Jinan Shandong
250000, China^1
关键词: Construction method;    Construction period;    Construction scheme;    Finite element analysis model;    Geometric non-linear;    Linear instabilities;    Non-linear stabilities;    Overall stabilities;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/397/1/012011/pdf
DOI  :  10.1088/1757-899X/397/1/012011
来源: IOP
PDF
【 摘 要 】

The synchronous construction method of tower and beam can greatly shorten the construction period of cable-stayed bridge, but the force condition is complicated. The overall stability of the bridge which use synchronous construction method should be studied further. Based on the Dingzihekou Bridge project, a finite element analysis model was established and three typical construction conditions were selected by using Midas Civil software. Linear stability analysis and geometric non-linear stability analysis about the construction period of the Dingzihekou Bridge were conducted. The stability factors of the two construction schemes and the modes of the linear instability failure in the construction periods of the cable-stayed bridgeare inferred. It is found that the geometrically non-linear stability safety factor is significantly less than the linear. There is no big difference in linear stability factor between synchronous construction and asynchronous construction of tower and beam. As for the geometric nonlinear stability analysis, the synchronous construction of tower and beam has a larger stable safety factor than asynchronous construction.

【 预 览 】
附件列表
Files Size Format View
Stability analysis of synchronous construction of towers and beams of cable-stayed bridge 217KB PDF download
  文献评价指标  
  下载次数:4次 浏览次数:24次