5th International Conference on Environmental Science and Civil Engineering | |
Study on Construction Method of High-Voltage Transmission Tower Beneath Shallow-Buried Tunnel | |
生态环境科学;土木建筑工程 | |
Xuan, Junjie^1 ; Yan, Songhong^2 ; Zhao, Tianming^3 | |
School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou, China^1 | |
Key Laboratory of Road and Bridge and Underground Engineering of Gansu Province, Lanzhou, China^2 | |
2nd Engineering Co. Ltd. of the 17th Bureau Group of China Railway, Taiyuan, Shanxi, China^3 | |
关键词: Comprehensive analysis; Construction method; Construction scheme; High-voltage transmission towers; On-site monitoring; Reliability demonstration; Settlement monitoring; Shallow-buried tunnel; | |
Others : https://iopscience.iop.org/article/10.1088/1755-1315/283/1/012049/pdf DOI : 10.1088/1755-1315/283/1/012049 |
|
来源: IOP | |
【 摘 要 】
Wangqiao tunnel of Jiu-jing-qu railway is used as engineering example, based on risk analysis, aim at the construction scheme, comprehensive analysis and calculation has carried on combined monitoring and numerical analysis. Reliability demonstration has conducted on comprehensive construction scheme of" ground surface grunting consolidation & mechanical excavation & improving support measure & settlement monitoring". Practice has proved that the deformation of the tunnel's settlement of the arch and the high-voltage transmission tower were in allowable ranges, and good economic and technical results are obtained, the results can provide a reference for similar projects.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Study on Construction Method of High-Voltage Transmission Tower Beneath Shallow-Buried Tunnel | 795KB | download |