会议论文详细信息
International Conference on Recent Advances in Materials, Mechanical and Civil Engineering | |
Resource Allocation in a Repetitive Project Scheduling Using Genetic Algorithm | |
材料科学;机械制造;土木建筑工程 | |
Samuel, Biju^1 ; Mathew, Jeeno^1 | |
Dept. of Mechanical Engineering, St. Joseph's College of Engineering and Technology, Palai | |
Kerala, India^1 | |
关键词: Project completion time; Project scheduling; Selection procedures; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/330/1/012098/pdf DOI : 10.1088/1757-899X/330/1/012098 |
|
来源: IOP | |
【 摘 要 】
Resource Allocation is procedure of doling out or allocating the accessible assets in a monetary way and productive way. Resource allocation is the scheduling of the accessible assets and accessible exercises or activities required while thinking about both the asset accessibility and the total project completion time. Asset provisioning and allocation takes care of that issue by permitting the specialist co-ops to deal with the assets for every individual demand of asset. A probabilistic selection procedure has been developed in order to ensure various selections of chromosomes.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Resource Allocation in a Repetitive Project Scheduling Using Genetic Algorithm | 345KB | download |