Fast Missile Boat Project Planning using CPM and What If Analysis Method
地球科学;生态环境科学
Silvianita^1 ; Firmansyah, R.^1 ; Rosyid, D.M.^1 ; Suntoyo^1 ; Chamelia, D.M.^1
Department of Ocean Engineering, Faculty of Marine Technology, Institut Teknologi Sepuluh Nopember, Surabaya, Indonesia^1
关键词: Missile boats;    Optimum conditions;    Optimum solution;    Poor performance;    Project completion time;    Project delays;    Project planning;    What-if Analysis;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/135/1/012014/pdf
DOI  :  10.1088/1755-1315/135/1/012014
学科分类:环境科学(综合)
来源: IOP
PDF
【 摘 要 】

This paper discusses analysis of fast ship missile project planning with CPM and What If analysis.The poor performance can cause project delay and cost overruns, these two things often occur in a project management. Scheduling has an important role to control the project. Good scheduling is required because it will affect the product quality. Scheduling is useful to manage the activities so that the project completion time can be as short as possible and it is used to determine the costs of the project are in optimum condition. The alternatives that can be used to overcome the delay project namely increasing labor and equipment.Project planning can be done to determine whether the project is already in an optimum condition. Alternatives that can be used to overcome the delay in the project is to increase labor and equipment, the next is to look for the optimum solution taking into account the duration and gain of each alternative.