会议论文详细信息
1st Annual Applied Science and Engineering Conference
Contingency Analysis of Electric Power Systems Sub-System 150 KV West Java Area II
工业技术;自然科学
Sucita, T.^1 ; Mulyadi, Y.^1
Department of Electrical Engineering Education, Universitas Pendidikan Indonesia, Jl. Dr. Setiabudi no 229, Jawa Barat, Bandung
40154, Indonesia^1
关键词: Contingency analysis;    Control and optimization;    Generation units;    Load-shedding;    Power capacity;    System improvements;    System reliability;    Voltage change;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/180/1/012290/pdf
DOI  :  10.1088/1757-899X/180/1/012290
来源: IOP
PDF
【 摘 要 】

Main generation area II technically served several plants that Jatiluhur, Saguling and Cirata. The backbone of the generation (slack bus) held by two units supplied by IBT 500/150 kV with a power capacity of each IBT is 500 MVA. One sample is a sub-system supplier Cirata has 13 transmission line connecting the substation 8 (GI) and has a total of 17 150/20 kV transformer with a capacity of 930 MVA, while the existing generation units at 150 kV Cirata subsystem is PLTPb Patuha with a power of 55 MW. Given the large power capacity with the strategic and vital functions of the sub-systems of 150 kV Cirata requires maximum control and optimization so that the distribution of electricity in West Java can be properly maintained. System Reliability of the power system must be maintained in order to supply power from the generator to the consumer to keep going well. In this study, the disorder will be analyzed is the contingency (N-1), a discharge of one of the channels on the system. Then analyzes the current and voltage changes to prepare for system improvements. Repairs are done when the contingency is to release the load (load shedding). Reliability was measured after load shedding in this study is to measure the quality of the voltage on the load side. At the time of the contingency (N-1), a decline below the voltage value SPLN on some rails GI, including rail Cigereleng (124.8 kV to 136.8 kV), rail Lagadar (125.4 kV to 137.1 kV), rail Padalarang (126.1 kV to 137.5 kV), North Bandung rail (125.5kV be 137.3 kV) and rail Cibabat (125.6 kV to 137.2 kV).

【 预 览 】
附件列表
Files Size Format View
Contingency Analysis of Electric Power Systems Sub-System 150 KV West Java Area II 899KB PDF download
  文献评价指标  
  下载次数:13次 浏览次数:24次