Modern Technologies in Industrial Engineering 2015 | |
Production scheduling with discrete and renewable additional resources | |
Kalinowski, K.^1 ; Grabowik, C.^1 ; Paprocka, I.^1 ; Kempa, W.^2 | |
Silesian University of Technology, Faculty of Mechanical Engineering, Institute of Engineering Processes Automation and Integrated Manufacturing Systems, Konarskiego 18A Str., Gliwice | |
44-100, Poland^1 | |
Silesian University of Technology, Faculty of Applied Mathematics, Institute of Mathematics, Konarskiego 23A Str., Gliwice | |
44-100, Poland^2 | |
关键词: One-machine; Operator support; Planning method; Production Scheduling; Resource requirements; Scheduling domain; Scheduling operations; Set-up time; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/95/1/012132/pdf DOI : 10.1088/1757-899X/95/1/012132 |
|
来源: IOP | |
【 摘 要 】
In this paper an approach to planning of additional resources when scheduling operations are discussed. The considered resources are assumed to be discrete and renewable. In most research in scheduling domain, the basic and often the only type of regarded resources is a workstation. It can be understood as a machine, a device or even as a separated space on the shop floor. In many cases, during the detailed scheduling of operations the need of using more than one resource, required for its implementation, can be indicated. Resource requirements for an operation may relate to different resources or resources of the same type. Additional resources are most often referred to these human resources, tools or equipment, for which the limited availability in the manufacturing system may have an influence on the execution dates of some operations. In the paper the concept of the division into basic and additional resources and their planning method was shown. A situation in which sets of basic and additional resources are not separable - the same additional resource may be a basic resource for another operation is also considered. Scheduling of operations, including greater amount of resources can cause many difficulties, depending on whether the resource is involved in the entire time of operation, only in the selected part(s) of operation (e.g. as auxiliary staff at setup time) or cyclic - e.g. when an operator supports more than one machine, or supervises the execution of several operations. For this reason the dates and work times of resources participation in the operation can be different. Presented issues are crucial when modelling of production scheduling environment and designing of structures for the purpose of scheduling software development..
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Production scheduling with discrete and renewable additional resources | 1100KB | download |