17th Pan-American Synchrotron Radiation Instrumentation Conference | |
Upgrades to the XRD1 beamline optics and endstation at the LNLS | |
Canova, H.^1 ; Fontoura, A.^1 ; Neuenschwander, R.T.^1 ; Diaz, B.^2 ; Rodella, C.B.^1 | |
Brazilian Synchrotron Light Laboratory (LNLS), Brazilian Center for Research in Energy and Materials (CNPEM), C. P. 6192, 13083-970, SP, Campinas, Brazil^1 | |
Canadian Light Source Inc., 44 Innovation Boulevard, Saskatoon, SK S7N 2V3, Canada^2 | |
关键词: Beam stability; Beamline optics; Capillary geometry; Fast data acquisition; National Instruments; Remote access; Reproducibilities; XRD patterns; | |
Others : https://iopscience.iop.org/article/10.1088/1742-6596/493/1/012004/pdf DOI : 10.1088/1742-6596/493/1/012004 |
|
来源: IOP | |
【 摘 要 】
XRD1 was the first X-ray diffraction beamline to be built at the LNLS and after approximately 12 years of operation it was substantially updated to improve beam stability, increase the reliability of the monochromator movement as well as provide an experimental hutch that would meet the demands of users. The improvements included the construction of an independent concrete slab below the mirror and monochromator to minimize the vibrations originating from the floor. In addition, the installation of new monochromator mechanisms as well as the replacement of the two Si(111) crystals were performed in order to attain higher precision, stability and reproducibility during operation. Moreover, the diffractometer was replaced by a 3-circle heavy duty diffractometer from Newport to collect XRD patterns primarily in capillary geometry. A robotic arm was installed for fast and automated replacement of samples as well as to secure a cryojet or a hot air blower in front of the sample during measurements. In addition, a housing equipped with 24 Mythen detectors was installed at the beamline allowing for extremely fast data acquisition. Another upgrade was the integration of motors and control systems from PXI National Instruments and Galil controllers with Phytron. These systems are crucial for the next upgrade that is underway at the beamline: enabling remote access for users to collect their measurements without the need to travel to the LNLS.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Upgrades to the XRD1 beamline optics and endstation at the LNLS | 677KB | download |