| International Conference on Innovations and Prospects of Development of Mining Machinery and Electrical Engineering 2018 | |
| Development of a cutoff valve for thermal-mining oil production | |
| 矿业工程;电工学 | |
| Verisokin, A.E.^1 ; Gunkina, T.A.^1 ; Mashkov, V.A.^1 | |
| North-Caucasus Federal University, 1 Pushkina ave., Stavropol | |
| 355009, Russia^1 | |
| 关键词: Fine adjustments; High-viscosity oil; Mining methods; Oil production; Operating practices; Operating well; Valve components; Well bore; | |
| Others : https://iopscience.iop.org/article/10.1088/1755-1315/194/8/082044/pdf DOI : 10.1088/1755-1315/194/8/082044 |
|
| 来源: IOP | |
PDF
|
|
【 摘 要 】
The paper describes a cutoff valve developed by the authors for thermal-mining method of oil production. The location of the cutoff valve components in the initial position and at the maximum opening of the hydrodynamic link between a borehole cavity and a gathering main are schematically shown. The procedure of installing the cutoff valve in the well bore is given. The cutoff valve is used to equip the wells of high-viscosity oil fields developed via thermal treatment. The design of a cutoff valve for a horizontal well at Yaregskoe field was carried out. The given design proved that the device allows for online fine adjustment and tuning of operating practices (opening and closing pressure) without dismantling. The proposed design will make it possible to increase the quality and efficiency of operating wells at Yaregskoe field.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| Development of a cutoff valve for thermal-mining oil production | 172KB |
PDF