会议论文详细信息
International Conference on Innovations and Prospects of Development of Mining Machinery and Electrical Engineering 2018
On issue of hydroelectric power plants
矿业工程;电工学
Brylina, O.G.^1 ; Semenova, K.D.^1 ; Nechitailo, S.I.^1
FSAEIHE SUSU (NRU) South Ural State University, National Research University, Lenina Ave., 76, Chelyabinsk
454080, Russia^1
关键词: Cost effective;    Functional diagrams;    Generator speed;    Hydropower plants;    Hydropower potential;    Main parameters;    Mountain rivers;    Three-phase rectifiers;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/194/6/062006/pdf
DOI  :  10.1088/1755-1315/194/6/062006
来源: IOP
PDF
【 摘 要 】

The paper presents data on the advantages of hydropower plants (HPPs). The diagram of hydropower potential of the RF rivers is given. It is noted that the most cost-effective construction is that of hydroelectric power plants on mountain rivers. An example of an autonomous complex of power supply with a power of 1 kW is considered. Its functional diagram is presented and the purpose of all nodes is explained. Also, the main parameters of each of the circuit nodes providing the given characteristics of the HPP under consideration are given. In addition to the synchronous generator with permanent magnets, the experimentally obtained dependences of the open circuit voltage and the short-circuit current on the generator speed at the output of the three-phase rectifier are presented. The proposed mini HPP can economically, safely and reliably provide the household and / or a small technological facility with electricity.

【 预 览 】
附件列表
Files Size Format View
On issue of hydroelectric power plants 197KB PDF download
  文献评价指标  
  下载次数:6次 浏览次数:15次