会议论文详细信息
2018 2nd International Workshop on Renewable Energy and Development
Construction risk assessment of deep foundation pit in metro station based on G-COWA method
能源学;经济学
You, Weibao^1 ; Wang, Jianbo^1 ; Zhang, Wei^1 ; Liu, Fangmeng^1 ; Yang, Diying^1
Qingdao University of Technology, Qingdao
266520, China^1
关键词: Construction risk assessments;    Construction risks;    Construction safety;    Control measures;    Deep foundation pit;    Evaluation index system;    Fuzzy comprehensive evaluation method;    Risk assessment methods;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/153/5/052018/pdf
DOI  :  10.1088/1755-1315/153/5/052018
来源: IOP
PDF
【 摘 要 】

In order to get an accurate understanding of the construction safety of deep foundation pit in metro station and reduce the probability and loss of risk occurrence, a risk assessment method based on G-COWA is proposed. Firstly, relying on the specific engineering examples and the construction characteristics of deep foundation pit, an evaluation index system based on the five factors of "human, management, technology, material and environment" is established. Secondly, the C-OWA operator is introduced to realize the evaluation index empowerment and weaken the negative influence of expert subjective preference. The gray cluster analysis and fuzzy comprehensive evaluation method are combined to construct the construction risk assessment model of deep foundation pit, which can effectively solve the uncertainties. Finally, the model is applied to the actual project of deep foundation pit of Qingdao Metro North Station, determine its construction risk rating is "medium", evaluate the model is feasible and reasonable. And then corresponding control measures are put forward and useful reference are provided.

【 预 览 】
附件列表
Files Size Format View
Construction risk assessment of deep foundation pit in metro station based on G-COWA method 349KB PDF download
  文献评价指标  
  下载次数:17次 浏览次数:24次