Research on Design and Construction Integration of Chongqing Rail Transit Line 9 | |
土木建筑工程;水利工程 | |
Lu, Zhiqiang^1 ; Du, Yongqiang^1 ; Guo, Xiaohong^2 ; Yao, Zaifeng^2 ; Wu, Jian^3 | |
China Construction Fifth Engineering Division CORP., LTD, Changsha, Hunan | |
410004, China^1 | |
China State Construction Technical Center, Beijing | |
101300, China^2 | |
China Construction Tunnel CORP.,LTD, Chongqing | |
401320, China^3 | |
关键词: Construction safety; Design and construction; Integrated designs; Ppp projects; Preliminary design; Rail transit lines; Underground excavation; Urban rail transit; | |
Others : https://iopscience.iop.org/article/10.1088/1755-1315/189/6/062069/pdf DOI : 10.1088/1755-1315/189/6/062069 |
|
学科分类:土木及结构工程学 | |
来源: IOP | |
【 摘 要 】
The first phase of Chongqing Rail Transit Line 9 is the first urban rail transit PPP project in China. The General Contracting Headquarters conducts integrated design and construction research at Baoshenghu station on the 9th line. On the basis of the preliminary design documents, the deep drawing design of the super-large section underground excavation subway station was carried out and the application was supervised on the site, and good benefits were obtained in construction safety, quality and progress. The integration of design and construction of the subway station with large section of the No. 9 line was first implemented in the rail transit industry, laying the foundation for the further promotion and application of the design and construction integration under the PPP mode.