会议论文详细信息
2nd International Conference on Sustainable Development in Civil, Urban and Transportation Engineering
Semi top-down method combined with earth-bank, an effective method for basement construction.
地球科学;运输工程;经济学
Tuan, B.Q.^1 ; Tam, Ng M^2
Faculty of Civil Engineering, Ton Duc Thang University, Ho Chi Minh City, Viet Nam^1
Faculty of Civil Engineering, Ho Chi Minh City University of Technology, Ho Chi Minh City, Viet Nam^2
关键词: Bottom up;    Bottom up methods;    Construction method;    Construction projects;    Deep excavation;    Open-cut method;    Steel struts;    Top-down methods;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/143/1/012047/pdf
DOI  :  10.1088/1755-1315/143/1/012047
来源: IOP
PDF
【 摘 要 】

Choosing an appropriate method of deep excavation not only plays a decisive role in technical success, but also in economics of the construction project. Presently, we mainly base on to key methods: "Bottom-up" and "Top-down" construction method. Right now, this paper presents an another method of construction that is "Semi Top-down method combining with earth-bank" in order to take the advantages and limit the weakness of the above methods. The Bottom-up method was improved by using the earth-bank to stabilize retaining walls instead of the bracing steel struts. The Top-down method was improved by using the open cut method for the half of the earthwork quantities.

【 预 览 】
附件列表
Files Size Format View
Semi top-down method combined with earth-bank, an effective method for basement construction. 2067KB PDF download
  文献评价指标  
  下载次数:16次 浏览次数:20次