Friendly City 4 'From Research to Implementation For Better Sustainability' | |
The workload analysis in welding workshop | |
地球科学;经济学 | |
Wahyuni, D.^1 ; Budiman, I.^1 ; Tryana Sembiring, M.^1 ; Sitorus, E.^1 ; Nasution, H.^1 | |
Industrial Engineering Department, Faculty of Engineering, Universitas Sumatera Utara, Medan, Indonesia^1 | |
关键词: Completion time; Top management; Workload analysis; Workload management; | |
Others : https://iopscience.iop.org/article/10.1088/1755-1315/126/1/012095/pdf DOI : 10.1088/1755-1315/126/1/012095 |
|
来源: IOP | |
【 摘 要 】
This research was conducted in welding workshop which produces doors, fences, canopies, etc., according to customer's order. The symptoms of excessive workload were seen from the fact of employees complaint, requisition for additional employees, the lateness of completion time (there were 11 times of lateness from 28 orders, and 7 customers gave complaints). The top management of the workshop assumes that employees' workload was still a tolerable limit. Therefore, it was required workload analysis to determine the number of employees required. The Workload was measured by using a physiological method and workload analysis. The result of this research can be utilized by the workshop for a better workload management.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
The workload analysis in welding workshop | 805KB | download |