Project Scheduling Based on Risk of Gas Transmission Pipe | |
地球科学;生态环境科学 | |
Silvianita^1 ; Nurbaity, A.^1 ; Mulyadi, Y.^1 ; Suntoyo^1 ; Chamelia, D.M.^1 | |
Ocean Engineering Department, Faculty of Marine Technology, Sepuluh Nopember Institute of Technology, Indonesia^1 | |
关键词: Completion time; Critical Paths; Gas transmission; Gas transmission pipeline; Microsoft Project software; Project completion; Project planning; Project scheduling; | |
Others : https://iopscience.iop.org/article/10.1088/1755-1315/135/1/012026/pdf DOI : 10.1088/1755-1315/135/1/012026 |
|
学科分类:环境科学(综合) | |
来源: IOP | |
![]() |
【 摘 要 】
The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.【 预 览 】