会议论文详细信息
2017 3rd International Conference on Environmental Science and Material Application
Analysis on the Operation Strategy of the 220kV External Transmission Channel for the Nujiang Power Grid after the Installation of Series Compensation
生态环境科学;材料科学
Liu, Xiaoxin^1 ; Feng, Peilei^2 ; Jan, Lisheng^1 ; Dai, Xiaozhong^1 ; Cai, Pengcheng^3
School of Electrical and Information Technology, Yunnan Minzu University, Kunming
650500, China^1
Nujiang Grid Bureau, Yunnan Grid Corporation Limited, Nujiang State
673100, China^2
School of Electrical and Information Technology, Shanghai Dian Ji University, Shanghai
200000, China^3
关键词: Fundamental changes;    Independent operations;    Operation strategy;    Series compensation;    Stable operation;    Structure and properties;    Transmission capacities;    Transmission channels;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/108/5/052092/pdf
DOI  :  10.1088/1755-1315/108/5/052092
来源: IOP
PDF
【 摘 要 】

In recent years, Nujiang Prefecture vigorously develop hydropower, the grid structure in the northwest of Yunnan Province is not perfect, which leads to the research and construction of the power grid lags behind the development of the hydropower. In 2015, the company in view of the nu river hydropower dilemma decided to change outside the nu river to send out a passage with series compensation device in order to improve the transmission capacity, the company to the main problems related to the system plan, but not too much in the region distribution network and detailed study. Nujiang power grid has unique structure and properties of the nujiang power grid after respectively, a whole rack respectively into two parts, namely power delivery channels, load power supply, the whole grid occurred fundamental changes, the original strategy of power network is not applicable, especially noteworthy is the main failure after network of independent operation problem, how to avoid the local series, emergency problem is more urgent, very tolerance test area power grid, this paper aims at the analysis of existing data, simulation, provide a reference for respectively after the operation for the stable operation of the power grid.

【 预 览 】
附件列表
Files Size Format View
Analysis on the Operation Strategy of the 220kV External Transmission Channel for the Nujiang Power Grid after the Installation of Series Compensation 158KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:15次