会议论文详细信息
28th IAHR symposium on Hydraulic Machinery and Systems
Preliminary investigation of flow dynamics during the start-up of a bulb turbine model
Coulaud, M.^1 ; Fraser, R.^1 ; Lemay, J.^1 ; Duquesne, P.^1 ; Aeschlimann, V.^1 ; Deschènes, C.^1
Hydraulic Machine Laboratory (LAMH), Department of Mechanical Engineering, Laval University, 1065 Avenue de la médecine, Québec
G1V 0A6, Canada^1
关键词: Electricity networks;    Experimental analysis;    Experimental set up;    Hydraulic power plant;    Start-up conditions;    Time resolved measurement;    Time resolved particle image velocimetry;    Validation measurements;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/49/6/062024/pdf
DOI  :  10.1088/1755-1315/49/6/062024
来源: IOP
PDF
【 摘 要 】

Nowadays, the electricity network undergoes more perturbations due to the market demand. Additionally, an increase of the production from alternative resources such as wind or solar also induces important variations on the grid. Hydraulic power plants are used to respond quickly to these variations to stabilize the network. Hydraulic turbines have to face more frequent start-up and stop sequences that might shorten significantly their life time. In this context, an experimental analysis of start-up sequences has been conducted on the bulb turbine model of the BulbT project at the Hydraulic Machines Laboratory (LAMH) of Laval University. Maintaining a constant head, guide vanes are opened from 0 ? to 30 ?. Three guide vanes opening speed have been chosen from 5 ?/s to 20 ?/s. Several repetitions were done for each guide vanes opening speed. During these sequences, synchronous time resolved measurements have been performed. Pressure signals were recorded at the runner inlet and outlet and along the draft tube. Also, 25 pressure measurements and strain measurements were obtained on the runner blades. Time resolved particle image velocimetry were used to evaluate flowrate during start-up for some repetitions. Torque fluctuations at shaft were also monitored. This paper presents the experimental set-up and start-up conditions chosen to simulate a prototype start-up. Transient flowrate methodology is explained and validation measurements are detailed. The preliminary results of global performances and runner pressure measurements are presented.