会议论文详细信息
All-Russian Scientific Conference with International Participation on Contemporary Issues of Hydrogeology, Engineering Geology and Hydrogeoecology in Eurasia
Prevention and remediation of rockslide at left portal of north tunnel of Da Nang _ Qu ang Ngai expressway in Quang Nam, Vietnam
Thinh, Phi Hong^1 ; Tuan, Pham Quoc^2 ; Minh, Pham Ngoc^3
University of Transport and Communications, Hanoi, Viet Nam^1
Society of Rock Mechanics, Hanoi, Viet Nam^2
Transport Engineering Design Incorporation, Hanoi, Viet Nam^3
关键词: Anisotropic rock;    Construction package;    Discontinuity model;    Failure criteria;    Geotechnical investigations;    One parts;    Rock slope;    Viet Nam;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/33/1/012045/pdf
DOI  :  10.1088/1755-1315/33/1/012045
来源: IOP
PDF
【 摘 要 】

Da Nang - Quang Ngai Expressway is one part of the North - South Expressway of Vietnam being 130km in length, 24.5m in width. The Tunnel is a section of 4 construction packages with station of 22+500km - 23+000km. The tunnel is designed to go through a small hill, altitude of about 120m above sea level and 500m long and has two bounds - called North and South Tunnel. The North Tunnel has two portals - left and right. Bedrock is sedimentary rock (alternation of sandstone and conglomerate). Authors have investigated the field, detected inaccuracy in geotechnical investigation report, applied discontinuity model and failure criterion for anisotropic rock, analyzed stability of rock slope and proposed a solution to prevent rockslide at the Left Portal of the North Tunnel of the Expressway.

【 预 览 】
附件列表
Files Size Format View
Prevention and remediation of rockslide at left portal of north tunnel of Da Nang _ Qu ang Ngai expressway in Quang Nam, Vietnam 981KB PDF download
  文献评价指标  
  下载次数:24次 浏览次数:23次