International Conference on Sustainable Energy and Green Technology 2018 | |
Energy Saving in a Process Plant using a Steam Accumulator | |
能源学;生态环境科学 | |
Ayyappan, Preethy^1 ; Kumar, Jeyanandan^2 ; Kumar Venkiteswaran, Vinod^3 | |
SEGi University, Selangor, Malaysia^1 | |
Infolliance, Selangor, Malaysia^2 | |
Herriot Watt University, Putrajaya, Malaysia^3 | |
关键词: Peak demand; Process plants; Short periods; | |
Others : https://iopscience.iop.org/article/10.1088/1755-1315/268/1/012154/pdf DOI : 10.1088/1755-1315/268/1/012154 |
|
学科分类:环境科学(综合) | |
来源: IOP | |
【 摘 要 】
This work was done in a process plant, where the steam demand was mostly steady but sometimes it peaks-up to the double of the average demand for a short period of time. The plant, in addition to a 5000kg/hr boiler, was continuously operating a huge capacity boiler to encounter this brief situation. This was resulting in unnecessary energy loss. As a solution, a steam accumulator was added on and only a lower capacity boiler was run. The short time peak demand of the plant was satisfied by supplying extra steam from the accumulator for a short period of time. By doing so a saving of about RM 300,000/year was achieved.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Energy Saving in a Process Plant using a Steam Accumulator | 452KB | download |