会议论文详细信息
International Conference on Sustainable Energy and Green Technology 2018
Energy Saving in a Process Plant using a Steam Accumulator
能源学;生态环境科学
Ayyappan, Preethy^1 ; Kumar, Jeyanandan^2 ; Kumar Venkiteswaran, Vinod^3
SEGi University, Selangor, Malaysia^1
Infolliance, Selangor, Malaysia^2
Herriot Watt University, Putrajaya, Malaysia^3
关键词: Peak demand;    Process plants;    Short periods;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/268/1/012154/pdf
DOI  :  10.1088/1755-1315/268/1/012154
学科分类:环境科学(综合)
来源: IOP
PDF
【 摘 要 】

This work was done in a process plant, where the steam demand was mostly steady but sometimes it peaks-up to the double of the average demand for a short period of time. The plant, in addition to a 5000kg/hr boiler, was continuously operating a huge capacity boiler to encounter this brief situation. This was resulting in unnecessary energy loss. As a solution, a steam accumulator was added on and only a lower capacity boiler was run. The short time peak demand of the plant was satisfied by supplying extra steam from the accumulator for a short period of time. By doing so a saving of about RM 300,000/year was achieved.

【 预 览 】
附件列表
Files Size Format View
Energy Saving in a Process Plant using a Steam Accumulator 452KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:18次