2018 4th International Conference on Environmental Science and Material Application | |
Study on construction technology of phosphogypsum wall | |
生态环境科学;材料科学 | |
Zhang, Yichao^1 ; Wang, Ying^1 ; Zhou, Jinghai^1 | |
School of Civil Engineering, Shenyang Jianzhu University, Shenyang | |
430070, China^1 | |
关键词: Construction efficiency; Construction technologies; High-efficiency; High-precision; Industrial solid wastes; Large-scale innovations; Resource utilizations; Surface smoothness; | |
Others : https://iopscience.iop.org/article/10.1088/1755-1315/252/2/022146/pdf DOI : 10.1088/1755-1315/252/2/022146 |
|
来源: IOP | |
【 摘 要 】
In this paper, the construction technology of new cast-in-situ phosphogypsum wall is studied through pouring tests of different wall types, and the pouring operability, accuracy and efficiency of the new wall is evaluated. The results show the surface smoothness and vertical deviation of cast-in-situ phosphogypsum wall are determined to be 3-4mm. The construction efficiency of cast-in-situ phosphogypsum wall is about 6-7m2/h, which realizes high-precision and high-efficiency construction of wall. The technology of cast-in-situ phosphogypsum wall provides an effective method for the resource utilization of industrial solid waste and the large-scale innovation of wall materials.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Study on construction technology of phosphogypsum wall | 446KB | download |