会议论文详细信息
International Conference on Green Agro-industry and Bioeconomy
The application of material handling in fish fillet production process of red snapper in PT X
农业科学;工业技术(总论);经济学
Rucitra, A.L.^1
Departmentof Agro-industrial Technology, Faculty of Agricultural Technology, Universitas Brawijaya, Malang, Indonesia^1
关键词: Human nutrition;    Marine resources;    Material handling;    Material transfers;    Production activity;    Production management;    Production management systems;    Production process;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/230/1/012061/pdf
DOI  :  10.1088/1755-1315/230/1/012061
来源: IOP
PDF
【 摘 要 】
Fish is one type of food that contains protein, fat, vitamins and minerals that are good in fulfilling necessary for human nutrition. Indonesia is a country with fisheries anda marine resources reaching 5.8 million km with a potential of 6.4 million tons of fish every year. PT X is one of the companies engaged in fish freezing in Indonesia which has exported many products to several countries. Production activities are the most dominant part carried out by PT X. A good production management system is system that regulates the smooth process of its production, besides that it is also determined by the proper handling of materials. In any companies, include PT. X, production activities are critical, thus a good production management is necessary to smoothing the production process and material handling. While, the material handling itself has a big portion in the operational cost. The purpose of this study was aimed to determine the application of material handling and the costs required in the process of handling red snapper fish in PT X. The results of the application of material handling that there are 8 directions of material transfer in the process of fish fillet production in PT X namely the transfer of material to Carbon monoxide's (CO) room, transfer to Air Blast Freezer (ABF), transfer to packing room, transfer to cold storage and transfer from ABF to containers. From these transfer, the total cost of these material transfer per day in PT X is IDR 291,592.94.
【 预 览 】
附件列表
Files Size Format View
The application of material handling in fish fillet production process of red snapper in PT X 795KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:48次