会议论文详细信息
International Conference on Manufacturing Technology, Materials and Chemical Engineering
Early hydration and setting process of cement-hydrated lime system at different curing temperatures
材料科学;化学工业
Zhang, Hui^1 ; Yang, Zhenghong^1^2 ; Su, Yufeng^1^2
School of Materials Science and Engineering, Tongji University, Shanghai
201804, China^1
Key Laboratory of Advanced Civil Engineering Materials of Ministry of Education, Tongji University, Shanghai
201804, China^2
关键词: Curing temperature;    Freeze dry;    Hydration process;    Hydration products;    Setting time;    Time resolution;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/592/1/012014/pdf
DOI  :  10.1088/1757-899X/592/1/012014
学科分类:材料科学(综合)
来源: IOP
PDF
【 摘 要 】
This paper investigated the hydration and setting process of the cement-hydrated lime system at the temperatures of 30°C, 40°C and 50°C with Vicat test, FTIR and TG-DTA. To obtain sufficient time resolution a freeze-dry procedure is used to instantaneously cease the hydration process. The results illustrate that a shorter initial and final setting time can be observed with a higher curing temperature. The thickening time is the same at the curing temperatures of 40°C and 50°C and is half as that at 30°C. The dissolution of C3S, the formation of C-S-H and the hydration product of C4AH13 from the reaction of C3A and Ca(OH)2 are the main causes of the thickening of the cement-lime system.
【 预 览 】
附件列表
Files Size Format View
Early hydration and setting process of cement-hydrated lime system at different curing temperatures 737KB PDF download
  文献评价指标  
  下载次数:12次 浏览次数:24次