| International Conference on Manufacturing Technology, Materials and Chemical Engineering | |
| Early hydration and setting process of cement-hydrated lime system at different curing temperatures | |
| 材料科学;化学工业 | |
| Zhang, Hui^1 ; Yang, Zhenghong^1^2 ; Su, Yufeng^1^2 | |
| School of Materials Science and Engineering, Tongji University, Shanghai | |
| 201804, China^1 | |
| Key Laboratory of Advanced Civil Engineering Materials of Ministry of Education, Tongji University, Shanghai | |
| 201804, China^2 | |
| 关键词: Curing temperature; Freeze dry; Hydration process; Hydration products; Setting time; Time resolution; | |
| Others : https://iopscience.iop.org/article/10.1088/1757-899X/592/1/012014/pdf DOI : 10.1088/1757-899X/592/1/012014 |
|
| 学科分类:材料科学(综合) | |
| 来源: IOP | |
PDF
|
|
【 摘 要 】
This paper investigated the hydration and setting process of the cement-hydrated lime system at the temperatures of 30°C, 40°C and 50°C with Vicat test, FTIR and TG-DTA. To obtain sufficient time resolution a freeze-dry procedure is used to instantaneously cease the hydration process. The results illustrate that a shorter initial and final setting time can be observed with a higher curing temperature. The thickening time is the same at the curing temperatures of 40°C and 50°C and is half as that at 30°C. The dissolution of C3S, the formation of C-S-H and the hydration product of C4AH13 from the reaction of C3A and Ca(OH)2 are the main causes of the thickening of the cement-lime system.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| Early hydration and setting process of cement-hydrated lime system at different curing temperatures | 737KB |
PDF