会议论文详细信息
11th International Seminar on Industrial Engineering & Management, "Technology and Innovation Challenges Towards Industry 4.0 Era | |
Job Scheduling for Hybrid Assembly Differentiation Flow Shop to Minimize Total Actual Flow Time considering Multi-Due-Dates | |
工业技术(总论) | |
Maulidya, R.^1 ; Suprayogi^1 ; Wangsaputra, R.^1 ; Halim, A.H.^1 | |
Industrial Engineering Faculty, Institut Teknologi Bandung, Bandung | |
40132, Indonesia^1 | |
关键词: Algorithm for solving; Due dates; Finished products; Flow-shops; Flow-time; Hybrid assembly; Initial solution; Job scheduling; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/528/1/012063/pdf DOI : 10.1088/1757-899X/528/1/012063 |
|
学科分类:工业工程学 | |
来源: IOP | |
【 摘 要 】
The hybrid assembly differentiation flow shop is a three-stage flow shop system with machining, assembly and differentiation stages. The machining stage produces k parts in independently unrelated dedicated machines. After k parts of a job completed, they are assembled at the assembly stage and assigned to dedicated machines for a final process. At the end, several types of finished products are resulted. The finished products should be delivered at their respective different due dates. The problem is to find a schedule considering multi due dates, and the criterion of minimizing total actual flow time. This paper proposes a model for job scheduling in a hybrid assembly differentiation flow shops and its algorithm for solving the problems. The initial solution is defined using SPT-based heuristic and it is optimized using variable neighbourhood descend method. The proposed model is tested using a set of hypothetic data. The solution shows that the algorithm can solve the problems effectively.【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Job Scheduling for Hybrid Assembly Differentiation Flow Shop to Minimize Total Actual Flow Time considering Multi-Due-Dates | 1328KB | download |