会议论文详细信息
3rd World Multidisciplinary Civil Engineering, Architecture, Urban Planning Symposium
Analysis of Obligatorily Used Price Systems in Public Works Contracts Procurement
土木建筑工程;文学
Vyskala, Miloslav^1 ; Aigel, Petr^1 ; Pospisilova, Pavla^1
Brno University of Technology, Faculty of Civil Engineering, Vevei 95, Brno
602 00, Czech Republic^1
关键词: Building engineering;    Construction works;    Cost calculation;    Czech Republic;    Economic parameters;    Management structure;    Price system;    Supply contracts;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/471/11/112071/pdf
DOI  :  10.1088/1757-899X/471/11/112071
学科分类:土木及结构工程学
来源: IOP
PDF
【 摘 要 】

The issue of public works and supply contracts in terms of bidding is closely related not only to the individual cost calculation of individual bidders, but also to the tools that can be used within the calculations. For the standardisation of the technical and economic parameters, comprehensive price systems can be used, while the use of these price systems is obligatory in the legal environment of the Czech Republic. The aim of this paper is to analyse the price systems used in the Czech Republic and to compare them in terms of costing of construction works and supplies. In particular, this paper offers a comparison of specific construction works in the area of building engineering and water management structures.

【 预 览 】
附件列表
Files Size Format View
Analysis of Obligatorily Used Price Systems in Public Works Contracts Procurement 291KB PDF download
  文献评价指标  
  下载次数:17次 浏览次数:42次