学位论文详细信息
Dynamic Programming Based Approach to Scheduling in the Fiber Optic Cable Industry
fiber optic cable;scheduling;dynamic programming
Miller, Stuart Robert ; Dr. Thom Hodgson, Committee Chair,king@eos.ncsu.edu, Committee Member,Steven Jackson, Committee Co-Chair,Miller, Stuart Robert ; Dr. Thom Hodgson ; Committee Chair ; king@eos.ncsu.edu ; Committee Member ; Steven Jackson ; Committee Co-Chair
University:North Carolina State University
关键词: fiber optic cable;    scheduling;    dynamic programming;   
Others  :  https://repository.lib.ncsu.edu/bitstream/handle/1840.16/1875/etd.pdf?sequence=1&isAllowed=y
美国|英语
来源: null
PDF
【 摘 要 】

The purpose of this research has been to develop a scheduling tool for use in the fiber optic cable industry by using a modified dynamic programming partition problem or stock cutting problem based approach. Modifications include a restructuring of the partition type matrix by ranking weights in descending, rather than traditional ascending order, and a loosening of the criterion for optimality. The application of this work would be to reduce the number of setups needed in an early manufacturing phase by determining orders that can be combined together to be manufactured in continuous runs. Any combinations that are decided upon must be made in the context of the needs of complex downstream processes and attributes of the physical system restrict the maximum length of any combination of orders. The solution to this problem is a program, which has been developed in a VB and FORTRAN environment, to automate the exploration of possible decisions. Results obtained garner an overall 25% reduction in setup requirements compared to existing scheduling policies.

【 预 览 】
附件列表
Files Size Format View
Dynamic Programming Based Approach to Scheduling in the Fiber Optic Cable Industry 399KB PDF download
  文献评价指标  
  下载次数:28次 浏览次数:8次