学位论文详细信息
Economic Evaluation of an Advanced Super Critical Oxy-Coal Power Plant with CO2 Capture
CO2 capture;oxy-fuel;advanced super critical;Carbon capture;coal power plant;levelized cost of electricity;financial modelling;LCOE;avoidance cost;oxy-coal;CCS;ASC;CANMET;Emission;GHG;Greenhouse gas;Chemical Engineering
Beigzadeh, Ashkan
University of Waterloo
关键词: CO2 capture;    oxy-fuel;    advanced super critical;    Carbon capture;    coal power plant;    levelized cost of electricity;    financial modelling;    LCOE;    avoidance cost;    oxy-coal;    CCS;    ASC;    CANMET;    Emission;    GHG;    Greenhouse gas;    Chemical Engineering;   
Others  :  https://uwspace.uwaterloo.ca/bitstream/10012/4693/1/ECONOMIC%20%20EVALUATION%20OF%20AN%20ADVANCED%20SUPER%20CRITICAL%20OXY-COAL%20POWER%20PLANT%20WITH%20CO2%20CAPTURE%20GSO%20updated.pdf
瑞士|英语
来源: UWSPACE Waterloo Institutional Repository
PDF
【 摘 要 】

Today’s carbon constrained world with its increasing demand for cheap energy and a fossil fuel intensive fleet of power producers is making carbon capture and storage (CCS) desirable. Several CCS technologies are under investigation by various research and development groups globally. One of the more promising technologies is oxy-fuel combustion, since it produces a CO2 rich flue gas which requires minor processing to meet storage condition requirements. In this study the economics of an advanced super critical oxy-coal power plant burning lignite, simulated in-house was assessed. A robust and user-friendly financial tool box has been developed with commonly acceptable default parameter settings. Capital, operation and maintenance costs were estimated along with corresponding levelized cost of electricity and CO2 avoidance costs calculated using the detailed financial model developed. A levelized cost of electricity of 131 $/MWhrnet along with a levelized CO2 avoidance cost of 64 $/tonne was estimated for an ASC oxy-coal power plant with CO2 capture. Also a levelized cost of electricity of 83 $/MWhrnet was estimated for an ASC air-fired coal power plant without CO2 capture capabilities as the base plant. The price of electricity was observed to increase from 83 $/MWhrnet to 131 $/MWhrnet translating into a 57% increase. The sensitivity of the overall economics of the process was assessed to several parameters. The overall economics was found sensitive to the choice chemical engineering plant cost index (CEPCI), capacity factor, size of power plant, debt ratio, fuel price, interest rate, and construction duration.

【 预 览 】
附件列表
Files Size Format View
Economic Evaluation of an Advanced Super Critical Oxy-Coal Power Plant with CO2 Capture 1730KB PDF download
  文献评价指标  
  下载次数:40次 浏览次数:90次