| The Central African Republic’s Infrastructure : A Continental Perspective | |
| Dominguez-Torres, Carolina ; Foster, Vivien | |
| 关键词: ACCESS TO ELECTRICITY; ACCESS TO SAFE WATER; ACCESS TO WATER SUPPLY; ACCESSIBILITY; ADMINISTRATIVE CAPACITY; | |
| DOI : 10.1596/1813-9450-5697 RP-ID : WPS5697 |
|
| 学科分类:社会科学、人文和艺术(综合) | |
| 来源: World Bank Open Knowledge Repository | |
PDF
|
|
【 摘 要 】
Between 2000 and 2005, infrastructurecontributed less than 1 percentage point to the CentralAfrican Republic's annual per capita GDP growth,despite substantial spending in the road sector. Raising thecountry's infrastructure endowment to that of theregion's middle-income countries could boost annualgrowth by about 3.5 percentage points. The CAR has madesignificant progress in the transport, water, power, andinformation and communications technology (ICT) sectors. Butthe high cost of fuel, which raises transportation andenergy costs, has been a vexing issue across allinfrastructure sectors. The CAR's most pressinginfrastructural challenge lies in the transport sector,which relies heavily on neighboring countries and couldbenefit from improved road conditions and enhancedperformance at the port of Douala in Cameroon. In the powersector, the country suffers from a deterioratinginfrastructure stock that it can no longer afford tomaintain, and an inefficient and unreliable power supply.Additional challenges include a need for improvedinfrastructure in the water and sanitation and ICT sectors.Addressing the CAR's infrastructure challenges willrequire sustained expenditure of $346 million per year overthe next decade. The nation already spends around $134million per year on infrastructure, with $37 million a yearlost to inefficiencies of various kinds. If thoseinefficiencies were fully eliminated, the country'sannual infrastructure funding gap would be $183 million peryear. Improvements in funding, coupled with the prospect ofan economic rebound and prudent policies, could lift thecountry from its fragile state back to and beyond theprosperity standards it once enjoyed.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| WPS5697.pdf | 2846KB |
PDF