科技报告详细信息
Transmitting Renewable Energy to the Grid : The Case of Mexico
Madrigal, Marcelino ; Jordan, Rhonda Lenai
World Bank, Washington, DC
关键词: approach;    BOTTOM LINE;    distribution grid;    electric utility;    electricity;   
RP-ID  :  85061
学科分类:社会科学、人文和艺术(综合)
来源: World Bank Open Knowledge Repository
PDF
【 摘 要 】

Mexico's 2010 national energy strategy aims to promote sustainability and simultaneously increase energy access by increasing the share of renewable resources used to generate energy. The wind farms of La Ventosa, a windy area in the southeastern state of Oaxaca, are a key part of that strategy, which aims to raise the share of renewables in generation to 35 percent by 2024, up from 23.7 percent in 2008. The open season process was a major breakthrough that made possible several agreements to build wind power generation projects in an area that previously had been closed to development because of the lack of transmission infrastructure. The open season process gave developers of renewable energy the certainty and predictability they needed concerning the development of transmission infrastructure, while also reducing the investment costs of that infrastructure by ensuring development of an optimized and shared network. Moreover, the system is transparent for all participants. It highlights the ability of Comision Federal de Electricidad (CFE) to modernize its role as a facilitator and creative problem solver, and encourages renewable energy developers and energy consumers to collaborate and follow through on their commitments for the benefit of all involved.

【 预 览 】
附件列表
Files Size Format View
850610BRI0Know0e0Energy0Case0Mexico.pdf 1418KB PDF download
  文献评价指标  
  下载次数:9次 浏览次数:15次