科技报告详细信息
Comparison Evaluation of the PFP FSAR and NRC Regulatory Guide 3.39 with DOE-STD-3009-94.
Oscarson, E. E.
Technical Information Center Oak Ridge Tennessee
关键词: Spent fuels;    Nuclear fuels;    PFP FSAR;    NRC Regulatory Guide 3.39;    Plutonium finishing plants;   
RP-ID  :  DE2003804231
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

One of the Plutonium Finishing Plant's (PFP) current Authorization Basis (AB) documents is the Final Safety Analysis Report (FSAR). This FSAR (HNF-SD-CP-SAR-02 1) was prepared to the format and content guidance specified in U.S. Nuclear Regulatory Commission (NRC) Regulatory Guide 3.39, Standard Format and Content of License Applications for Plutonium Processing and Fuel Fabrication Plants (RG 3.39). In April 1992, the US. Department of Energy (DOE) issued DOE Order 5480.23 which established the FSAR requirements for DOE nonreactor nuclear facilities. In 1994, DOE issued DOE-STD-3009-94, Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports, which is a format and content guide addressing the preparation of FSARs in accordance with DOE Order 5480.23.

【 预 览 】
附件列表
Files Size Format View
DE2003804231.pdf 4937KB PDF download
  文献评价指标  
  下载次数:15次 浏览次数:56次