Management Prestart Review Phase 1 for the NIF Optics Assembly Building (OAB).
Dragoo, V.
Technical Information Center Oak Ridge Tennessee
关键词: US National Ignition Facility;    Project management;    Construction management;    Buildings;    Readiness;   
RP-ID  :  DE200515013510
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】
A Management Prestart Review (MPR) for the National Ignition Facility (NIF) Optics Assembly Building (OAB) was conducted from June, 2000, through October, 2000. This review was performed to determine readiness of the facility and management to transfer the facility from the construction to the commissioning and operations phase. This review process provides assurance that the appropriate line management is in place to effect the turnover. Completion and acceptance of this report constitutes a turnover of facility and equipment operational responsibility from the Beampath Infrastructure System Construction organization to the Assembly Installation and Refurbishment Operations (assembly equipment installation/activation and mechanical cleaning operations) and the Beampath Infrastructure System (BIS) Commissioning and Operations Organizations (conventional facility operations).
【 预 览 】
附件列表
Files Size Format View
DE200515013510.pdf 2797KB PDF download
  文献评价指标  
  下载次数:9次 浏览次数:30次