Operational Readiness Review Implementation Plan for K Basin Sludge Water System.
Technical Information Center Oak Ridge Tennessee
关键词: Radioactive waste management;    Performance;    Sludges;    Fuel storage pools;    Waste retrieval;   
RP-ID  :  DE2004824972
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

The purpose of this ORR is to confirm the contractor's ability to safely start Sludge Waster System (SWS) operations in the K-East Basin North Loadout Pit (NLOP) and the readiness of Richland Operations Office (RL) line organization to effectively oversee the contractor. This Implementation Plan provides the overall approach and guidelines for performance of the DOE ORR at KE Basin for the NLOP activity. A separate Implementation Plan will be developed for the DOE ORR at the Radiochemical Processing Laboratory (RPL) or an alternate facility selected to treat or store the sludge packaged in the Large Diameter Containers (LDCs). Appendix A contains the Criteria and Review Approach Documents (CRADs), which define the review objectives and criteria, as well as the approach for assessing each objective. ORR results will be published in a final report.

【 预 览 】
附件列表
Files Size Format View
DE2004824972.pdf 2484KB PDF download
  文献评价指标  
  下载次数:9次 浏览次数:29次