科技报告详细信息
Drilling, Sampling, and Analysis Plan for Installation of a Well Within the Vicinity of the Plutonium Finishing Plant. | |
Mitchem, G. B. | |
Technical Information Center Oak Ridge Tennessee | |
关键词: Well drilling; Plutonium; Sampling; Hanford reservation; Water wells; | |
RP-ID : DE2001787376 | |
学科分类:工程和技术(综合) | |
美国|英语 | |
来源: National Technical Reports Library | |
【 摘 要 】
This sampling and analysis plan describes the rationale and strategy for drilling, sampling, and analysis in support of installation of a well near the Plutonium Finishing Plant.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
DE2001787376.pdf | 979KB | download |