科技报告详细信息
National Ignition Facility Fracture Control Plan.
Brereton, S.
Technical Information Center Oak Ridge Tennessee
关键词: National Ignition Facility;    Fractures;    Components;    Failures;    Requirements;   
RP-ID  :  DE200515013512
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

The NIF contains a large number of optics that also act as vacuum barriers. These are subject to brittle failures that may result in significant consequences. This Fracture Control Plan identifies the requirements, needed documentation, and required actions for minimizing the potential for brittle failures of these fracture-critical components in the NIF laser system. The goal of this plan is to ensure that all fracture-critical systems present no more than a low level of risk. Risk considers both consequences (to workers, the environment, and public confidence) and probability of failure. This plan interprets and implements the guidance contained in the ME Design Safety Standard, Section 5.4, 'Design Safety Standards for Fracture Critical Components for High Power Laser Systems.'

【 预 览 】
附件列表
Files Size Format View
DE200515013512.pdf 753KB PDF download
  文献评价指标  
  下载次数:19次 浏览次数:8次